Short introduction
Siphon drainage layer butt welding machine is suitable for PP, PB, PE, PVDF thermoplastic material of pipes and fittings in ditches or on site operation. The most competitive wholesale price can provide regular size inventory and prompt delivery. For more information about Siphon drainage layer butt welding machine, please contact us!
1. Welding range: 50mm-200mm
2. Application: PE, PB, PP and PVDF
3. Working voltage: 220V±10%
4. Planning tool: 1.1KW, heating plate: 2.8KW
JUNNUO butt welding equipment is suitable for PP, PB, PE, PVDF thermoplastic material of pipes and fittings in ditches or on site operation. The size ranges from 20mm-630mm. With Strong technical force, with senior engineers R & D team, using German technology, in strict accordance with the German electrical industry standards for manufacturing to provide customers with quality products.
JUNNUO can supply various butt welding equipment include: Socket welding fusion machine, electrofusion butt welding machine automatic hydraulic butt welding machine, hydraulic butt welding machine, manual butt welding machine, etc.
Siphon drainage layer butt welding machine is a welding equipment specially used for same-layer drainage system. It uses hot-melt butt welding technology to weld thermoplastic pipe fittings. This welding machine usually has a heating plate and an independent high-precision temperature control system, as well as an electric milling cutter and a limit switch to ensure the safety and efficiency of the welding process. Its design features include independent separation of the heating plate and the milling cutter for easy operation, and mechanical locking to maintain welding pressure.
Siphon drainage layer butt welding machine is mainly used for welding thermoplastic pipes with an inner diameter of 50 to 200 in the groove. It can effectively cut the pipes and butt them. It is suitable for the fields of same-layer drainage, siphon rainwater, and water purification engineering construction. The use of this welding machine improves the installation efficiency and quality of the same-layer drainage system, ensures the firmness of the pipe connection and the reliability of the system
1. Wide range: Suitable for workshop extension of injection molding short pipe fittings, production of pipe fitting assemblies, etc., especially for the indoor installation design of the same-layer drainage pipe, which can meet the needs of different scenarios.
2. Technical features: The heating plate has an independent high-precision temperature control system to ensure welding quality; the electric milling cutter and limit switch prevent the milling cutter from accidentally starting and improve operational safety.
3. Convenient operation: Mechanical locking maintains welding pressure, and the heating plate and milling cutter are separated for easy operation; ultra-wide power supply voltage and frequency input to adapt to power restrictions on construction sites.
Strong environmental adaptability: It has automatic voltage stabilization and automatic temperature compensation functions, and is not affected by ambient temperature during welding;
Technical parameter
Siphon drainage layer butt welding machine200 |
Includes basic frame, planing tool, heating plate and stand |
|||
Fusion Range |
dia (mm):50 63 75 90 110 140 160 180 200 |
|||
Butting Deviation |
≤0.3mm |
Package(mm) |
Wooden case
555X555X555 |
|
Temperature Deviation |
±3°C |
G.W(KG). |
58.90 |
|
Operation Temperature |
220°C |
|
Weight(kg) |
Power(W) |
Ambient Temperature |
-5- + 40°C |
Heating Plate
|
3.70 |
1.8KW/220V |
Required Time for Welding Temperature |
< 20min |
Planing tool
|
7.30 |
0.68KW/220V |
|
|
|
||
Applicable Material |
PE, PP-R, PB, PVDF |
Specifications subject to change will inform in time.
Instructions:
1. Place the pipe to be welded on the frame and secure the pipe by locking the gland screw.
2. Place the planing tool on the frame, planer and mill the pipe mouth to ensure the smooth pipe end.
3. Take out the planing tool, planing and milling pipe to the center, ensure both ends in the same line.
4. Put in the preheated heating plate and shake the handle by hand to evenly heat the pipe end.
5. Remove the heating plate, and connect the pipe end to the natural cooling, and ensure the cooling pressure.
6. After welding, check whether the flanges are even and test the pressure.