Short introduction
Hydraulic butt fusion welding machine is suitable for PP, PB, PE, PVDF thermoplastic material of pipes and fittings in ditches or on site operation. The sizes ranges from 400mm-630mm. The most competitive wholesale price can provide regular size inventory and prompt delivery. For more information about Hydraulic butt fusion welding machine, please contact us!
1. Welding range: 400mm-630mm
2. Application: PE, PB, PP and PVDF
3. Working voltage: 220V±10%
4. Planning tool: 1.1KW, heating plate: 4.5KW
JUNNUO butt welding equipment is suitable for PP, PB, PE, PVDF thermoplastic material of pipes and fittings in ditches or on site operation. The size ranges from 20mm-630mm. With Strong technical force, with senior engineers R & D team, using German technology, in strict accordance with the German electrical industry standards for manufacturing to provide customers with quality products.
JUNNUO can supply various butt welding equipment include: Socket welding fusion machine, electrofusion butt welding machine automatic hydraulic butt welding machine, hydraulic butt welding machine, manual butt welding machine, etc.Hydraulic Butt Fusion Welding Machine 450 is a kind of equipment specially used for plastic pipe welding, which belongs to a kind of hot-melt butt welding machine. This welding machine adopts hydraulic system to control the butt force to ensure accurate and stable pressure, and is suitable for hot-melt butt welding of plastic pipes such as PE pipe, PB pipe, PP pipe, etc.
It consists of four parts: operating platform (hydraulic, electronic), fixture, heating plate, and milling cutter.
The frame is made of high-strength aluminum alloy material, with a solid structure and a 45° tilt design.
The fixture adopts a four-ferrule structure to accurately position the pipe and easily adjust the misalignment.
Control system: The hydraulic system is used to control the butt force, the heating plate has an independent electronic temperature control system, and the digital display is intuitive.
Safety performance: Equipped with electric milling cutter and safety limit switch to prevent accidental start of the milling cutter, and adopts solenoid valve electric control (cylinder advance and retreat), which is easier to operate.
Technical parameters: including specific data such as welding specifications, docking deviation, temperature error, total power consumption, hydraulic system working pressure, working temperature, ambient temperature, and time required to reach welding temperature.
This welding machine is not only suitable for the construction and maintenance of infrastructure such as tap water pipelines, but also widely used in petroleum, chemical industry, agricultural irrigation and other fields. It is one of the indispensable equipment in modern industrial production
1.Clamping pipe: Fix the pipe to be welded on the fixture of the welding machine to ensure that the end face of the pipe is flat and aligned, and prepare for subsequent heating and docking.
2.Milling connection surface: Use a milling cutter to mill the end face of the pipe to remove the oxide layer and impurities to ensure the quality of welding.
3.Heating end face: Place the heating plate on the end face of the pipe and heat it to an appropriate temperature, usually 220±10℃, to melt the end face of the pipe.
4.Remove the heating plate: The heating time is calculated according to the thickness of the pipe. After heating is completed, quickly remove the heating plate.
5. Butt joint: After removing the heating plate, quickly butt the two heated pipe ends together to ensure that the two ends fit tightly.
6. Pressure maintenance and cooling: After butt joint, apply appropriate pressure for a period of time to fully fuse the pipe ends, and then let the joint cool to room temperature under pressure to form a connection with higher strength than the pipe body.
Technical parameter
Hydraulic butt welding machine630 |
Includes basic frame, planing tool, heating plate, hydraulic unit, stand and trolly |
||
Fusion Range |
did (mm): 400 450 500 560 630 |
Package(mm) |
|
Butting Deviation |
≤ 0.5mm |
Basic Frame |
Wooden Case 1170X810X840 |
Temperature Deviation |
±3°C |
Hydraulic Unit |
Wooden Case 1140 x 550 x 910 |
Total Section of Cylinders |
23.06CM² |
Accessories |
Wooden Case 900X 610X 1150 |
Heating plate Max Temperature |
299°C |
G.W. ( Total) |
440.0KG |
Operation Pressure Range |
0-6.3MPa |
Power(W) |
|
Applicable Material |
PE, PP-R, PB, PVDF |
Heating Plate |
4.5KW/380V |
Ambient Temperature |
-5- *40°C |
Planing Tool |
1.1KW/380V |
Required Time for Welding Temperature |
< 35min |
Hydraulic Unit |
1.5KW/380V |
|
|
Hydraulic butt welding machine630 |
Includes basic frame, planing tool, heating plate, hydraulic unit, stand and trolly |
||
Fusion Range |
did (mm): 400 450 500 560 630 |
Package(mm) |
|
Butting Deviation |
≤ 0.75mm |
Basic Frame |
Wooden Case 1360X900X1030 |
Temperature Deviation |
±3°C |
Hydraulic Unit |
Wooden Case 1140X550X910 |
Total Section of Cylinders |
37.20CM² |
Accessories |
Wooden Case 945X650X1250 |
Heating plate Max Temperature |
299°C |
G.W. ( Total) |
610.0KG |
Operation Pressure Range |
0-6.3MPa |
Power(W) |
|
Applicable Material |
PE, PP-R, PB, PVDF |
Heating Plate |
7.5KW/380V |
Ambient Temperature |
-5- *40°C |
Planing Tool |
1.5KW/380V |
Required Time for Welding Temperature |
< 35min |
Hydraulic Unit |
1.5KW/380V |
|
|
Specifications subject to change will inform in time
Instructions:
1. Place the pipe to be welded on the frame and secure the pipe by locking the gland screw.
2. Place the planing tool on the frame, planer and mill the pipe mouth to ensure the smooth pipe end.
3. Take out the planing tool, planing and milling pipe to the center, ensure both ends in the same line.
4. Put in the preheated heating plate and shake the handle by hand to evenly heat the pipe end.
5. Remove the heating plate, and connect the pipe end to the natural cooling, and ensure the cooling pressure.
6. After welding, check whether the flanges are even and test the pressure.